BLATN BR-CON air quality monitoring project for Alibaba Building ventilation system
Wangjing Alibaba Building
Beijing Wangjing Alibaba Building ventilation system upgrade and renovation, the new fan group installed a purification section at the back end, indoor installation fan coil return air purification section, indoor suspended air purification equipment installed in the ceiling, each floor of the equipment installed automatic control electrical control box.
The air quality automatically matches the purification mode, such as reducing the amount of fresh air when the indoor carbon dioxide concentration is not high and turning on the indoor circulating purifier to achieve energy saving.